Ibbythe8356 Ibbythe8356
  • 04-05-2019
  • Social Studies
contestada

When planning your week the first thing to consider about each activity that your scheduling is its priority level?

Respuesta :

RyleeCanaan12 RyleeCanaan12
  • 04-05-2019

Answer:

yes

Explanation:

i think that if you are going to get things done, than you need to think about how important they are. if something is needed in two weeks, you can save that for later. if something is needed in two or three days, i would do that first. different people have different ways of planning, but that is my opinion

Answer Link

Otras preguntas

The pressure on a sample of gas is increased from 1.0 atm to 3.0 atm. If the new volume is 0.52 L, find the original volume
Sathre Corporation is an oil well service company that measures its output by the number of wells serviced. The company has provided the following fixed and var
I need help on figuring out what this equation is
Find the value of r so the line that passes through the pair of points has the given slope. (r, 3), (5, 9), m=2
Evaluate (picture below of the problem)
If cosθ= 1/7 and tanθ= 5/3 then what is sinθ?
Determine the real root(s), if any,of the quadratic function shown below
21 2f=9f what does f equal
297/1000 in simplest form​
According to the theory of plate tectonics, what drives the motion of the continents?