aliyucivil1982 aliyucivil1982
  • 04-08-2019
  • Engineering
contestada

Estimate the quantity of soil to be excavated from the borrow pit​

Respuesta :

lola2487
lola2487 lola2487
  • 04-08-2019

Answer

1056

Explanation:

for example

A soil is to be excavated from a borrow pit which has a density of 1.75g/cc and water content of 12%. The G is 2.7 the soil is compacted to that water content of 18% and dry density of 1.65g/cc. for 1000 m3 of soil used in fill estimate

Quantity of soil to be excavated from pit in m3

Answer Link

Otras preguntas

what tool can you use to check your writing proper spelling grammar puntcuation and capitalization
The sides of a triangle measure 6 inches, 8 inches, and10 inches. The triangle has one 90" angle. What type of triangle is it?
simplify sec^2x+sec^2x*tan^2x
A chart is two separate charts put together as one.
What is the average rate of change for this exponential function for the interval from x=2 to x=4?
Name the two numbers located 7 units away from -3 on a number line
I need help with both
If you bang on a large metal gong with a stick, producing a loud sound that can be heard by your friend down the street, how does this sound travel to your frie
An apple falls because of the gravitational attraction to earth. how does the gravitational attraction of earth to the apple compare? (does force change when yo
Verify if (5/3,-2/3) is a solution to the system of equations y=1/2x-3/2 and y=-x+1