Ahmatsuper Ahmatsuper
  • 01-02-2021
  • Mathematics
contestada

A construction company can remove 25,200 pounds of dirt from a construction site in 8 hours.

Respuesta :

1726890 1726890
  • 02-02-2021

Answer:

yes they can how efficient

Step-by-step explanation:

Answer Link

Otras preguntas

What is larger 0.6 or 3/4 explain?
Write the number that matches the clues My number has 2 hundreds. The tens digit is 9 more than the ones digit
373 of 500 in fractions and decimal
Which is larger 7% or 0.7 why?
which has the least absolute value?A. 5B. 30C. -10D. -50
A cross-country automobile rally is 1,025 kilometers long. At a stopping place the letter had traveled 867 kilometers. How far away was finish line
What features of colonial politics in 18th century America contributed to the development of popular democracy, and what kept political life from being more tru
Convert 14mm to its equivalent in m using dimensional analysis
There are two ways of adding two square numbers to make 65. Write a different square number in each box. [ ] + [ ].
The length of Marshall's poster is 2 times its width. If the perimeter is 72 inches, what is the area of the poster?