Q11.
It takes 3 painters 2 days to complete a job. Work out how long 1 painter would take.

Respuesta :

26liujiaying
26liujiaying 26liujiaying
  • 03-02-2021

Answer:

6

Step-by-step explanation:

1 painter is 1/3 of 3 painters, so the answer is 2 x 3=6

Hope I helped!

Answer Link

Otras preguntas

What's the other word speaking in circles; round-about speech
what do I do to figure out this problem:3x+8=26+x
Solve the quadratic by factoring 2X²-2X-12=0
How did Niccolo Machiavelli’s book The Prince set him apart from other writers of the Renaissance?
Solve the quadratic by factoring 2X²-2X-12=0
round to the nearest hundredth 5.6192
A tree casts a shadow 27 m long. At the same time, the shadow cast by a 66-cm tall statue is 56 cm long. Find the height of the tree to the nearest tenth of a
How do we use the Pythagoras theorem in "everyday life".
Liz wants to drink 1.5 litres of water each day. She buys the water in packs of 6 bottles. Each bottle contains 0.5 litres of water. How many packs of water do
why dog pants during summer use the cocept of evaporation