shresthasamrachana06
shresthasamrachana06 shresthasamrachana06
  • 01-04-2021
  • Mathematics
contestada

12 workers can do a peice of work in 20 days. How many workers should be added to complete work in 16 days?​

Respuesta :

atchleyamirah69
atchleyamirah69 atchleyamirah69
  • 01-04-2021
3 workers

if 12 workers can do a piece of work in 20 days, then one person can do it in 240 days. 240/16 is 15. That is the number of workers that you need in total to it in 16 days. Since the question ask how many more workers,
15 - 12 = 3 more workers.
Answer Link

Otras preguntas

the o2− ion has _____ protons and _____ electrons.
find the product of (3x − 4)(2x2 2x − 1). 6x3 2x2 − 5x 4 6x3 14x2 − 11x 4 6x3 − 14x2 − 5x 4 6x3 − 2x2 − 11x 4
what's is the solution to the equation? 2/3a-1/6=1/3 options! a=1/4 a=7/ 12 a=1/6 a=3/4
what is the value of x/3y , when x = 18 and y = 3? 318 2 3 6
it's 4oclock in New York City what time is it in Seattle Washington
I need help understanding ratios and how they can be equivalent to each other
What is the value of x in the figure? (Figure included.)
3x − 1/2(8x − 2) = 4 step 1: 3x − 4x 1 = 4 step 2: x 1 = 4 step 3: x 1 − 1 = 4 − 1 step 4: x = 3 which step was the error made and why? a. step 1, because incor
charakterystyka juranda ze spychowa
a natural disaster of a fire has occurred what could happen to this food chain