15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

What was the price elasticity of demand for iPhones in 2007 prior to the price reduction if the percentage change in price was 40%?
Describe darwin's observation on the galapagos islands during his voyage on the hms beagle
Michelle spent $32 on hot dogs and hamburgers. Hot dogs were $5 and hamburgers $6.if she bought a total of 6 items .how many of each kind did she buy? A. 2 hot
Through the points (-1,-9) and (2,6) find the equation
If the amount of atoms of each type on the left and right sides of a reaction differs, what must be done to balance it?
there is little wind in the doldrums becouse the air
magnesium reacts with hydrochloric acid to produce magnesium chloride and hydrogen gas the reactants in this reaction are
Marisol is finding the slope of the line containing the points (3,7) and (5,10)
How did the police respond to protestors at the democratic national convention in 1968?
I need help with #4 please