mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

The process of rewriting for clarity and error correction is called _____.
Hyperbole is _____. understatement exaggeration a type of metonymy an implied metaphor
Children and adults can both benefit from having a dietician.
What are the three finger print ridge patterns?
24% of 1,321 is how much?
jefferson got a hit 30% of the 240 times he went to bat during the season write 30% as a reduced fraction and then find the number of hits he got during the sea
Roger Williams arrived in Massachusetts in 1631 to become the pastor in Portsmouth. a. True b. False
The basketball team is selling t-shirts for $9 each. On Monday, they sell 4 t-shirts. On Tuesday, they sell 5 times as many t-shirts on Monday. How much money d
Nail roots are to nails as what is to hair? A. sebaceous gland B. keratin C. hair follicle D. melanocyte
World War I began when Austria-Hungary declared war on Serbia in 1914. Which of the following directly caused other countries like Germany, Britain, France, and