In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

said vs told - why is she mad at you? - i told/said her to leave me alone and yea, whats is more correct? Emily's told me or Emily told me
x-2y=-4,:x=2y-4 Find the value of x and y
A fast-moving car has 0.5 MJ of kinetic energy. The driver brakes and the car comes to a halt. How much work is done by the force provided by the brakes?
which graph represents the solution for the equation 1/2x-1=-x+2
Suppose you roll a regular 6-sided die with the numbers 1 through 6. What is the probability that you roll a 3 and then roll a 4? Give your answer as an exact f
Complete the code to generate a pseudo-random integer between 1 and 50, including the possibility of both 1 and 50. > >>> import secrets >>&g
Hibbshsjjdidjdidifi iridieh
Is it dangerous for the blood pressure fluctuation?.
In a command economy, many basic needs are provided by the A. upper class B. government C. small business owners D. individual communities Please select the bes
I need help with this please​