agyasmithmartersax agyasmithmartersax
  • 01-05-2017
  • Mathematics
contestada

An average of 2,000 charts need to be coded each month. if it takes an average of 15 minutes to code each chart— how many charts does the average coder code per 8-hour day?

Respuesta :

Bea1111 Bea1111
  • 01-05-2017
Put 8 hours into minutes which is 60•8= 480.
Then divide 480 by 15 to find how many charts are coded in 8 hours by a coder.
480/15= 32.

So the average worker codes 32 charts per 8-hour work day.
Answer Link

Otras preguntas

Given a = -3, b = 4 and c = -5, evaluate ab + c. -4 -17 7
Which of the following situations best describes why excluding the value of a variable from the denominator of an algebraic fraction is necessary? 1)The value
Which of the following natural disasters in kashmir (pakistan) killed around 86000 people and injured more than 69000 people
What are the two general methods used to attack a cipher?
A house is generally warmer upstair that it is downstairs due to
Which statement is true if the Hrxn of a reaction is positive? A.)The reaction is endothermic. B.)The reaction is exothermic. C.)There is more reactant than pro
match the term French questions?
solve 20p−60 using GCF
I WILL GIVE BIG BRAINLEST FOR WRITE ANSWER Review the scenario. A student copies his older brother's research paper and turns it in for a grade. Which best i
How did the muslim military elite ensure the recruitment of troops and their loyalty?