ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

what gives you 28 when adding and 18 when multiplying
What is 8,624 divided by 98
if a bike rider travels 4 km in an hour,what is his speed measured in miles per hour?
How to use oder of operations??
ALGEBRA 30. The difference of three times a number and 4 is -19 32. The sum of twice a number and half the number is 10. 34. Four times the difference of a numb
Which of the following sentences is punctuated correctly? I want to go to the concert but I'm not sure if I will be able to make it to see the beginning. I want
what is 33/84 in simplest form? And can you show the work?
how to write 430,290,100 in expanded form
why do other people in most countries use the metric system
What is 10.6 as a fraction