baseballjay20oyr38t baseballjay20oyr38t
  • 01-11-2017
  • Mathematics
contestada

one maid can clean the house three times faster than another. Working together they can clean the entire house in 3 hours. How long would it take the faster maid cleaning alone?

Respuesta :

EchoFlower
EchoFlower EchoFlower
  • 01-11-2017
Faster maid DATA:
time = x hr/job ; rate = 1/x job/jhr
Slower maid DATA:
time = 3x hr/job ; rate = 1/3x job/hr
Together DATA:
time = 3 hr/job ; rate = 1/3 job/hr
Equation:
rate + rate = together rate
1/x + 1/3x = 1/3
Multiply thru by 3x to get:
3 + 1 = x
x = 4 hrs (time for the faster maid to do the job)
Answer Link

Otras preguntas

Roger earns 3% commission on sales of $9,500 as an electrical supplies wholesaler. What is his commission?
what would an illiegitimate government look like?
what is 8.63 as a mixed number in simplest form ?
(2 1/2+2/5) (5 1/3-16/3)​
How ? Do you do this ?
Which sentence from the passage best supports the author’s viewpoint that the situation is hopeless? “We all pulled our soaked blankets tighter around our shoul
lily traveled 10 blocks north and 5 blocks east to visit her friend marie. if she were able to walk directly to marie's house, approximately how many blocks wou
0.8cL converted into hL
what is the diameter​
find the equation of a line that is parallel to the equation y-3= 4/3(x+2) that passes through the point (-3,5).