Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

What circumstances enabled Djenné-Djeno to become a bustling trade center?
What’s the degree 2x^5-2x^4+1x^3-9x-x-1
Find the equation of the line with slope = 2 and passing through (-3 , 4)
An attorney represented a company on transactional matters. After the U.S. Securities and Exchange Commission (SEC) advised the company that it was the subject
A rope of negligible mass is stretched horizontally between two supports that are 9.56 m apart. When an object of weight 4140 N is hung at the center of the rop
Why has China experienced substantial economic growth since the late 1970s? A. High tariffs and strict trade regulations have helped the country benefit from gl
EOCs receive senior level guidance from:
Air can be considered a mixture. Which statement helps describe air? A) Air contains a fixed ratio of atoms. B) The components of air separate into visible l
in the expression 7m/9+6r-4/5, what are the coefficients?
how do u do this????